|
PLC Networking of A Housing Building with Centralized Ammeters : Phase One
Project Intro:
A residential building,
with 7 floors and 2 stairways. There
is a distribution box with centralized power meters under each
stairways.
Two PLC FPR-10M Routers will be installed close to
distribution
boxes respectively,
, and signal lines will be coupled to
ammeter
outbound lines with magnetic cylinders for signal
injection.
It is required that internet access must be available in
all end user rooms without any damage to interior
decoration.
Solution:
Adopting electromagnetic Induction for signal injection
and avoiding direct contact with electric power.

|