Ordinary Housing Building (7 floors, centralized power meters)

  Figure below is a housing building with 7 floors. The power meters are centralized in the distribution box of first floor. We can simply install the PLC bridge (FPC-10MA) closed to the distribution box, and connect coupling lines to  power meters respectively (see figure below). Then connect the bridge to Internet. With PLC modem FPM -10MA, our end users will be able to surf on the Internet.