|
Ordinary Housing Building (7 floors,
centralized power meters)
Figure below is a housing building with 7 floors. The
power meters are centralized in the distribution box of first
floor. We can simply install the PLC bridge (FPC-10MA) closed to
the distribution box, and connect coupling lines to power
meters respectively (see figure below). Then connect the bridge
to Internet. With PLC modem FPM -10MA, our end users will be
able to surf on the Internet.

|
|